Skip to content

Menu

Search the site

    Tall completed precast concrete wall of the ATI Manufacturing Facility with a scaffold stair tower

    ATI Manufacturing Facility

    Details
    Building FunctionManufacturing Facility
    LocationRowley, UT
    ArchitectATI, Inc
    PrecasterContech Engineered Solutions
    Precast EngineerCKR Engineers

    This manufacturing facility is nearly a quarter mile long, 80 feet tall, and features a 120-foot clear span roof and is constructed entirely of precast concrete elements. Precast columns, bridge girders, double tee floors and walls, and flat wall panels are all utilized in this building.

    Photos

    ATI Manufacturing Facility photos

    1 / 12